Analysis of Regional Tourism in Azerbaijan

Meridian Integrated Business Solutions Inc. has surveyed regional tourism facilities, and prepared a report with the request and funding of State Tourism Agency of Azerbaijan Republic. The report analyzes and presents the results of survey performed in restaurants, hotels and wineries in the target regions of Azerbaijan on basic statistics, management and performance, as well as training needs assessment. It includes all findings of the survey and research and the full analysis of results and a set of conclusions and recommendations. The team of 14 professionals of MIBS were involved in surveys, data management and report writing. The experience and expertise of local and international partner companies were used in all stages of the project. The recommendations and the instructions of the client were closely examined and followed. As part of the project, in total 289 facilities have been visited and surveyed in 25 cities, out of which 170 are hotels, 112 are restaurants and 7 are wineries. Surveys were conducted for around 40 days from August, 2019 to October, 2019. The final report on analysis of the results was prepared in October, 2019.

"Labdisc Concept" Baku, Azerbaijan

“Labdisc” is a mini laboratory project for education facilities. In 2014, the concept was introduced in Azerbaijan and the Ministry of Education of the Republic of Azerbaijan was given detailed information about this concept. From the first acquaintance with this mini-laboratory, which is mainly for K-12 (secondary) educational programs, interest has increased. In 2015, the Ministry of Education decided to apply this equipment to 50 schools in Azerbaijan as a pilot project. It was decided to apply Labdisc concept to 50 secondary schools appointed by the Ministry of Education as a pilot project for the 2015-2016 academic year. On April 6, 2016, the Ministry of Education held an event on the successful implementation of the Labdisc Concept in Baku and the awarding ceremony of the teaching staff who successfully implemented this product was also provided with the relevant certificate. Meridian Integrated Business Solutions Inc. has provided consulting services, coordination with Ministry of Education, arranging meetings and trainings, presentation of the product, preparation contract and other necessary paperwork with the cooperation of Triton Consulting.

"Hotel Management Training Service" Project

For the first time in Azerbaijan, this project was implemented to train professionals in the field of tourism and provide them with relevant professional certificates. With the participation of specialists invited from Absheron Hotel Group, 220 training courses were organized for hotel and tourism staff. In this project, the Ministry of Education provided its professional certificates to the practitioners participating in the project. Meridian Integrated Business Solutions Inc. with the cooperation of Triton Consulting provided consultancy services, Coordination between parties, inviting trainers from abroad and providing trainings, translation services, preparation contract and other necessary paperwork.

Distribution services for Fibrelle® Products

Fibrelle is dedicated to supply products that based on the philosophy of quality and meets customers’ utmost demands. The company offers variety of products ranging from sweeteners to diet products.Meridian Integrated Business Solutions Inc. partnered with Fibrelle to open new doors to the products in the US market. Our company further helped for in-depth market research, brand registration, packaging & labeling, as well as the final distribution and selling of high quality Fibrelle product in the US market.

Solid Waste Management Plant, Baku-Azerbaijan

The plant capacity is 500,000 t / per year. The construction site of 20 hectares is located in the area of the Balakhany landfill. The facility will generate 231,500 megawatt of electricity from incineration of household waste. An agreement on design, building, operating and provision of technical services on «turn-key» basis for the waste-to-energy plant was signed with the winning bidder French Constructions Industrielles de la Mediterranee S.A. (CNIM S.A.) on December 15, 2008. The plant was completed in 2012 with success.

Meridian Integrated Business Solutions Inc. with the cooperation of Triton Consulting provided consulting services, coordination with governmental organizations, coordination with design institute for adaptation of the design, obtaining necessary approvals, translation services.

“Socar Polymer Polypropilen and High Density Polyethylene” Plants in Sumgayit, Azerbaijan

The complex of plants constructed in a 30 ha site reserved within the SCIP (Sumgait Chemical Industrial Park) for Socar Polymer. LLC. Production capacity of the polypropylene plant is 180,000 ton a year. The HDPE plant’s production capacity is 120,000 ton a year. The engineering, procurement and construction (EPC) contract for the polypropylene plant, ancillary utilities and offsite facilities was awarded to Maire Tecnimont (Italy), who executed the project through its subsidiaries Tecnimont and Kinetics Technology. The project management consultant (PMC) is Fluor.

Meridian Integrated Business Solutions Inc. with the cooperation of Triton Consulting provided consulting services to EPC Contractor Tecnimont SpA & KT-Kinetics Technology SpA and developed more than 300 technical passports and certificates for equipments supplied for the plant.

Interpretation and Consulting Services to UNDP Azerbaijan

Meridian Integrated Business Solutions Inc. has provided interpretation and consulting services in conferences hold in September and October, 2019 by United Nations Development Program Azerbaijan.